Equipment Locations and Storage Descriptions
All A/V equipment will be located in one of the following locations, and it all must go back into one of these locations at the conclusion of the event. It is important to keep the equipment organized. Generally, the equipment should be placed back in the locations where you found it. Here is a list of all of the locations where our A/V equipment can be found:
-
Streaming Unit case
This is also known as the “Webstream Unit”, “Streaming Unit”, or other similar names. It is a large, tall black case on wheels labeled as the “streaming unit”. It contains the main streaming equipment and cameras. -
Audio Case
This is also known as the “mic box”, “mic case”, or similar. It is a small, square rackmount case that has a suitcase handle and wheels. It contains the equipment needed to run the wireless microphones. -
A/V Totes
These are a series of four green totes, labeled on each short side with gaff tape as “A/V”, a route label (north or south) and a specific type label. There are four A/V totes: Audio, Power, SDI, and Ethernet. -
A/V Case
This is also known as “Case 26”. It is a large, tan, wheeled case that contains miscellaneous equipment used for A/V, but the most relevant contents for this guide are the audio mixer, speakers, and projector. -
Projection Screen case
This is a short, long, black wheeled case that contains the large projection screen used at events.
Stages and Order of Setup
The setup of the FIRST Chesapeake Audio/Visual equipment can be broken down into distinct tracks of tasks, each of which may be accomplished in parallel. However, within each distinct track certain tasks rely on others, so the order of tasks within them is important to follow. Also note that the following dependencies on other tracks:
-
The FMS relies on the Chesapeake Router being cabled up and active. Expect intervention from the FTA if this is not very quickly setup.
- Most tracks rely on Track 1 being finished. At a minimum the case needs to find its “home” for the event, and the back panel needs to be removed so the I/O panel is accessible.
- Track 2.2 relies on Track 2.1 being finished. You cannot run cable to a camera that isn’t staged in position yet!
- Track 5 relies on field assembly being partially complete. At a minimum, the field border needs to be finished so the camera can be properly aimed.
Track 0 (Gathering Materials)
Each of the five pieces of Equipment Storage described above should be moved to near where they will live during the event after they are removed from the Pods. Each event has a designated location for the screen and for A/V equipment, please consult with the Equipment Manager to determine where the setup is to be located. In the Equipment Manager’s absence, the Event Manager can also provide guidance.
Track 1 (Core Streaming Unit & Network Setup)
- 1a. Initial Streaming Unit Setup and Core Cabling
- 1b. Cable up Chesapeake Router
- 1c. Start Up Streaming Unit
- 1d. Login to Streaming Unit and Test Connectivity
- (If necessary for troubleshooting) 1e. Configure Chesapeake Router
- 1f. Sync Media Files
Track 2.1 (Assembly and Mounting of Cameras)
Track 2.2 (Cabling of Cameras)
- 2c. Cable Center Camera (Includes cable back to Streaming Unit)
- Cable Alliance Cameras (Includes cable back to Streaming Unit)
Track 3 (Audio Setup)
- 3a. Audio Box Setup and Core Cabling
- 3b. Streaming Unit Audio Cabling
- Sound Board Setup and Audio Leveling
Track 4 (Screen and Projector Setup)
- 4a. Unpack and Assemble Screen
- Cable up Projector
Track 5 (Finishing Touches)
- Focus and adjust cameras
- Setup Audience Display
- Setup OBS
Striking and Teardown
- Locations for Teardown